Wiring an electrical panel of an ultrasonic cleaner with 2-axis robot
Step1: Measuring and cutting ducts & 35mm rails according to panel layout plan
Step2: screwing them on the panel.
Step3: Mounting equipment such as MCBs, terminal blocks, relays, thermostat, power supply and contractors according to the panel layout plan.
Wiring 3-ph panels phase per phase.
Step1: connecting PE terminal of electrical equipments such as phase control relay, PLC and servo drivers to PE terminal blocks. (Look at top left corner of the pic)
Step2: wiring of neutral terminal of all equipments.
Step3: wiring of L1(R) phase of all equipments.
Step4: wiring of L2(S) phase of all equipments.
Step5:wiring of L1(R) phase of all equipments.
Description
Step1: mounting wires panel inside the cabinet.
Step2: Connecting wires from cabinet to panel such as incoming power terminal, round terminals on cabinet.
Step3: Connecting HMI and push button wires on cabinet to acossiated terminals on panel.
Step4: Connecting control terminals servo motor via cable to round terminal on panel.
This is amazing!
Congratulations @asgeng! You have completed the following achievement on the Hive blockchain and have been rewarded with new badge(s) :
You can view your badges on your board And compare to others on the Ranking
If you no longer want to receive notifications, reply to this comment with the word
STOP
Do not miss the last post from @hivebuzz:
Support the HiveBuzz project. Vote for our proposal!
Show us the actual robot.